Files
disasm/Pinball (JU)/copilot/pinball_zp_map.tsv
T
tmerritt 9eb04ea7ef Adds overview for WIP projects
Promote Ice Climber (JE) and Ice Climber (U) to top-level

- git mv _wip/Ice Climber (JE) -> Ice Climber (JE)
- git mv _wip/Ice Climber (U) -> Ice Climber (U)

- Added header.s / chr.s (one-line .incbin each)
- Added HEADER/PRG/CHR linker.cfg with proper memory layout
- Added copilot/rom.nes symlink to original ROM
- Updated Makefile for whole-ROM build (reconstructed.nes vs rom.nes)
- Updated _tools paths from ../../../_tools/ to ../../_tools/

Both projects: Pass 1/2/3 complete, byte-identical at whole-ROM level (verified).

Root OVERVIEW.md updated:
- Inventory: Ice Climber JE/U moved from _wip/ rows 23-24 to top-level rows 21-22
- Tier split: BYTE-IDENTICAL now rows 1-22 (+36), PRG-IDENTICAL rows 23-35
- Summary table: Added Ice Climber JE/U as rows 21-22
- _wip/ section: count 17 -> 15
- verify_pass1.py scope: 19 -> 22 top-level projects

All 22 top-level projects verified byte-identical.

Promote Lode Runner (U) to top-level: Pass 2/3 complete, whole-ROM byte-identical

- git mv _wip/Lode Runner (U) -> Lode Runner (U)

- Added header.s / chr.s (one-line .incbin each)
- Added HEADER/PRG/CHR linker.cfg with proper memory layout
- Added copilot/rom.nes symlink to original ROM
- Updated Makefile for whole-ROM build (reconstructed.nes vs rom.nes)

Both projects: Pass 2/3 complete, byte-identical at whole-ROM level (verified).

Root OVERVIEW.md updated:
- Inventory: Lode Runner moved from _wip/ row 25 to top-level row 23
- Tier split: BYTE-IDENTICAL now rows 1-23 (+36), PRG-IDENTICAL rows 24-35
- Summary table: Added Lode Runner as row 23 with BYTE-IDENTICAL (Pass 2/3 complete)
- _wip/ section: count 15 -> 14
- verify_pass1.py scope: 22 -> 23 top-level projects
- Audit comment count: 19 -> 22 top-level projects
- Pass 3 symbols: 19 -> 22 top-level projects

All 23 top-level projects verified byte-identical.

TODO.md updated:
- Current state: 22 -> 23 top-level projects
- _wip/ count: 15 -> 14
- verify_pass1.py scope: 22 -> 23
- Audit comment count: 19 -> 22
- Pass 3 symbols: 19 -> 22
- Label residue table: Ice Climber JE/U removed, Lode Runner added
- Five false Pass 2 claims section updated with Ice Climber & Lode Runner completions

Promote Pinball (JU) to top-level: Pass 2/3 complete, whole-ROM byte-identical

- git mv _wip/Pinball (JU) -> Pinball (JU)

- Added header.s / chr.s (one-line .incbin each)
- Added HEADER/PRG/CHR linker.cfg with proper memory layout
- Added copilot/rom.nes symlink to original ROM
- Updated Makefile for whole-ROM build (reconstructed.nes vs rom.nes)

Both projects: Pass 2/3 complete, byte-identical at whole-ROM level (verified).

Root OVERVIEW.md updated:
- Inventory: Pinball moved from _wip/ row 30 to top-level row 24
- Tier split: BYTE-IDENTICAL now rows 1-24 (+36), PRG-IDENTICAL rows 25-35
- Summary table: Added Pinball as row 24 with BYTE-IDENTICAL (Pass 2/3 complete)
- _wip/ section: count 13, rows 25-35
- verify_pass1.py scope: 23 -> 24 top-level projects
- Audit comment count: 19 -> 22 top-level projects
- Pass 3 symbols: 19 -> 22 top-level projects

All 24 top-level projects verified byte-identical.

TODO.md updated:
- Current state: 23 -> 24 top-level projects
- _wip/ count: 14 -> 13
- verify_pass1.py scope: 23 -> 24
- Label residue table updated
- Documentation follow-ups updated

Promote Millipede (U) and Popeye (JU) (PRG 0) to top-level

Promote two _wip/ projects out of _wip/ into top-level folders, each now
verified whole-ROM byte-identical against the original ROM.

- Millipede (U): moves all copilot files up, adds header.s, chr.s,
  linker.cfg with PRG+HEADER+CHR areas, rom.nes copy, and switches the
  Makefile from PRG-only cmp to whole-ROM cmp. Makefile _tools depth
  adjusted (../../../../_tools/ -> ../../_tools/).
- Popeye (JU) (PRG 0): same promotion treatment.
- AGENTS.md: update layout notes (19 top-level projects mention the
  canonical audit format; update tier counts 27->29 top-level / 9->7 _wip).
- OVERVIEW.md: root inventory table updated with the two promotions and
  re-numbered _wip rows.
- TODO.md: handoff updates.
- Remaining _wip projects: assorted pass 2/3 edits (prg.s, locals.inc,
  reconstructed.lbl, reconstructed_prg.bin) for Popeye (JU) (PRG 1),
  Pyramid (U), Raid on Bungeling Bay (U), Raid on Bungeling Bay (U) [a2].
2026-10-19 19:58:41 -04:00

151 lines
1.9 KiB
Plaintext

zp Zp00 Zp00
zp Zp01 Zp01
zp Zp02 Zp02
zp Zp03 Zp03
zp Zp04 Zp04
zp Zp05 Zp05
zp Zp06 Zp06
zp Zp07 Zp07
zp Zp08 Zp08
zp Zp09 Zp09
zp Zp0A Zp0A
zp Zp0B Zp0B
zp Zp0C Zp0C
zp Zp0D Zp0D
zp Zp0E Zp0E
zp Zp0F Zp0F
zp Zp10 Zp10
zp Zp11 Zp11
zp Zp12 Zp12
zp Zp13 Zp13
zp Zp14 Zp14
zp Zp15 Zp15
zp Zp16 Zp16
zp Zp17 Zp17
zp Zp18 Zp18
zp Zp19 Zp19
zp Zp1A Zp1A
zp Zp1B Zp1B
zp Zp1C Zp1C
zp Zp1D Zp1D
zp Zp1E Zp1E
zp Zp1F Zp1F
zp Zp20 Zp20
zp Zp21 Zp21
zp Zp22 Zp22
zp Zp23 Zp23
zp Zp24 Zp24
zp Zp25 Zp25
zp Zp26 Zp26
zp Zp27 Zp27
zp Zp28 Zp28
zp Zp29 Zp29
zp Zp2A Zp2A
zp Zp2B Zp2B
zp Zp2C Zp2C
zp Zp2E Zp2E
zp Zp2F Zp2F
zp Zp30 Zp30
zp Zp31 Zp31
zp Zp32 Zp32
zp Zp33 Zp33
zp Zp34 Zp34
zp Zp35 Zp35
zp Zp36 Zp36
zp Zp37 Zp37
zp Zp38 Zp38
zp Zp39 Zp39
zp Zp3A Zp3A
zp Zp3B Zp3B
zp Zp3C Zp3C
zp Zp3D Zp3D
zp Zp3E Zp3E
zp Zp3F Zp3F
zp Zp40 Zp40
zp Zp41 Zp41
zp Zp42 Zp42
zp Zp43 Zp43
zp Zp44 Zp44
zp Zp48 Zp48
zp Zp4A Zp4A
zp Zp6A Zp6A
zp Zp77 Zp77
zp Zp7A Zp7A
zp Zp84 Zp84
zp Zp8A Zp8A
zp Zp9A Zp9A
zp ZpB2 ZpB2
zp ZpB3 ZpB3
zp ZpB4 ZpB4
zp ZpB5 ZpB5
zp ZpB6 ZpB6
zp ZpB7 ZpB7
zp ZpB8 ZpB8
zp ZpB9 ZpB9
zp ZpBA ZpBA
zp ZpBB ZpBB
zp ZpBC ZpBC
zp ZpBD ZpBD
zp ZpBE ZpBE
zp ZpBF ZpBF
zp ZpC0 ZpC0
zp ZpC1 ZpC1
zp ZpC2 ZpC2
zp ZpC3 ZpC3
zp ZpC4 ZpC4
zp ZpC5 ZpC5
zp ZpC6 ZpC6
zp ZpC7 ZpC7
zp ZpC8 ZpC8
zp ZpCA ZpCA
zp ZpCC ZpCC
zp ZpCD ZpCD
zp ZpCE ZpCE
zp ZpCF ZpCF
zp ZpD0 ZpD0
zp ZpD1 ZpD1
zp ZpD2 ZpD2
zp ZpD3 ZpD3
zp ZpD4 ZpD4
zp ZpD5 ZpD5
zp ZpD6 ZpD6
zp ZpD7 ZpD7
zp ZpD8 ZpD8
zp ZpDB ZpDB
zp ZpDC ZpDC
zp ZpDD ZpDD
zp ZpDE ZpDE
zp ZpDF ZpDF
zp ZpE0 ZpE0
zp ZpE1 ZpE1
zp ZpE2 ZpE2
zp ZpE3 ZpE3
zp ZpE4 ZpE4
zp ZpE5 ZpE5
zp ZpE6 ZpE6
zp ZpE7 ZpE7
zp ZpE8 ZpE8
zp ZpE9 ZpE9
zp ZpEA ZpEA
zp ZpEB ZpEB
zp ZpEC ZpEC
zp ZpED ZpED
zp ZpEE ZpEE
zp ZpEF ZpEF
zp ZpF0 ZpF0
zp ZpF1 ZpF1
zp ZpF2 ZpF2
zp ZpF3 ZpF3
zp ZpF4 ZpF4
zp ZpF5 ZpF5
zp ZpF6 ZpF6
zp ZpF7 ZpF7
zp ZpF8 ZpF8
zp ZpF9 ZpF9
zp ZpFA ZpFA
zp ZpFB ZpFB
zp ZpFC ZpFC
zp ZpFD ZpFD
zp ZpFE ZpFE
zp ZpFF ZpFF